Monday, December 28, 2015

"Dragon Ship"

The "Dragon Ship" is finally completed and resting in its new home at the Rock County Courthouse in Luverne, MN I'm very pleased with the results of this lengthy and challenging project.

Here are more pictures from the process:

When I was satisfied with the second attempt at the hull, I made an "epic" decision to cut the head and tail off the dragon and attached it to the new hull made of thicker copper sheet.
 When I was happy with the outcome, I started gaining momentum at finishing the project. I wanted to maintain good proportions on the ship, so I made measurements and reference points and figured out what size my Viking people would be. I made little figures out of flattened copper wire I had for another idea on the ship that petered out. (One seated and one standing) These figures helped me decide on oar length along with shield size and sail height. I had to get my head into the mindset of a shipbuilder.

 Once the hull was formed to where I liked the curvature, I needed a deck. I cut the deck from the etched copper printing plate below.

 After cutting into rough shape, I added hammered texture. I hand hammered at first but soon grew tired and my arms were sore so I switched to my treadle hammer which I made from an antique sewing machine.

 I had made a mast a while ago before the second attempt at the hull. Minor modifications and adding a mastfish support on deck allowed for installation.
 A support pipe for the drop-in mast was soldered in below deck.
 Just for fun. I tested its water displacement. It floated surprisingly well.
 Shields are all hand cut discs with finished edges. I used a dapping block to make the bumps in the centers.
 I modeled my steering oar after the ones in my Viking book.
 This steering oar is cast from bronze and modeled after the oar on the Osberg ship pictured.
 Traditionally, the pivot point was achieved by using knotted rope through the hull and the oar. I wanted to use metal and therefore I decided to look around for something to re-purpose. I found the ball and socket style joint on the brass light pull chain in the studio.
 I only needed a little bit.

 Above is the finished steering oar.
 It actually functions.
 The first shield getting soldered onto the ship.
 One side done.
 Shields installed.

 Mast was pretty easy to fabricate.
 The hardest part was measuring and drilling holes to thread the jump-rings through.


 Cleaning started
 Cleaning progress
 Clean
 Clean and ready for a real base to sit on... Two actually...
 I cast bronze into a pattern I cut from ceiling tile.
 Freshly poured bronze in the mold cooling.

 Vice grips to temporarily hold bases to make decisions. I decided they needed to be raked and the ship lower.
 Bases drilled and had copper tubing inserted and secured.
 Bases are ready for final trimming.
 Angle gauge used to check.
 First complete assembly.


 Starting the patina
 Still working on the patina.
Bottom patina added. Very precariously placed patina platform. Avoided two horrible casualties here. Dropping rods before ship was up and bumping rods while the ship was suspended.
 Ceiling tile works great for casting, but also for holding oars to patina.
 Rubber tips added to bases to protect ship from scratches.
 patina completed on ship and mast.
More to come...

Friday, December 25, 2015

Viking ship

So, I've been working on this Viking ship for quite sometime. This project had been plagued with the fabrication troubles from early on. After lots of attempting to fix these issues, I eventually started making a second hull with a different method.(sticking to what I'm used to, instead of the original method based on a paper fold-into-shape model.

Starting over was a good decision. When I got to the same point on the new one that I left on the old one, I lopped off the head and tail of the Dragon and placed them on the new one.



To be continued... lots of news and pictures to come.


Monday, September 7, 2015

2015 Driftless Art Fair

Come join me for conversation and check out the rest of the 2015 Driftless art fair September 19th and 20th from 10am until 5pm at the Beauford T. Anderson Park, Soldiers Grove, WI.

FREE ADMISSION AND PARKING
Culinary Arts
Performing Arts
Music
Visual Art

I will be in booth #67 as highlighted in the map below. Thank you all for your support. I pray for good weather and a successful event.


Tuesday, June 30, 2015

New works and another art fair

My apologies on the picture quality... I've been working at a new place which allows for limited studio time. I have been pushing to get into the studio every day and try to make work. Here was a little commission I made from a friend at work. He gave me a real bear claw and asked if I could make a metal one without a high polish surface. I decided to use cuddle-bone (hence the texture) to cast sterling silver. I love how it turned out and so did my friend and his wife. Thank you for your support. This was a fun project to get the wheels turning once again.


Below are some new vessels. I implemented some new methods and tried to push limits of the materials and my skill level. I also attempted to replicate a personal favorite with minor changes.
"Dimples"
Check out the vessels tab for more details and more works.

 "Green Bold III"

 "Dark Matter"


I am also pleased to announce that I will be a vendor at the Driftless Area Art Festival, Saturday September 19th and Sunday September 20th. Hopefully I will be informed as to where my booth will be located so I can pass on the details for those of you who would be visiting me.

The fair is at the Beauford T. Anderson Park in Soldiers Grove, WI. The event has free admission and parking, 80 visual artists, live music and local foods. Show is open Saturday 9/19 from 10am until 5pm and Sunday 9/20 from 10am until 4 pm.  More info at: www.DriftlessAreaArtFestival.com Please stop in and say hello.

Thanks for reading. :)

Monday, April 13, 2015

Wedding gift from the forge at Mjolnir studio.

I recently made this wedding gift out of three nails given to me from my sister. She asked me to make a gift for a friends wedding. I wasn't sure what to make at first. After I thought of several things that didn't seem to take root, I decided to try forging a figurative sculpture. It all came together quite well and I used the welder in the studio for the first time. It had been a while since I welded or forged anything so it took a while. One bend here negates one or two bends there. Finally, after forming the nails the way I wanted them, I looked through a box of odd metal bits and stumbled across a metal swivel bracket from an antique chalkboard. I was pretty excited because the size worked well with the sculpture and was also fitting because the gift was intended for a teacher. Congratulations on your marriage Jenny!
 


Monday, February 23, 2015

It's cold outside. Here are several project updates.

I had received bronze casting grains finally and so I began casting. I started with a green-sand mold for the viking ship project's dragon head. Below is the sculpted clay on packed sand, its ready for the second part of the sand mold to be added.
 The top part of the flask is attached and locked in place with bolts through the side walls.
 Sand is packed into the cope (top part of the mold) I used a vacuum cleaner extension to create a pouring sprue cavity in the sand.
 After packing the sand I removed the cope from the drag(bottom part of mold) Baby powder was used as a release agent between the two halves.
 Mold in place, Everything set out and inspected for safety and efficiency. 
 Below: The crucible is heated in the forge.
 Before pouring
 After pouring
I couldn't upload the video of the bronze pour and cracking open the mold because of the size. You can find it on my facebook page. Search for "Art of Adam Oldre" on Facebook. You could try this link but I'm not sure if it will work. https://www.facebook.com/aoldre?ref=hl
 The best part about this sand is that the grains that haven't been burned can be reused.
Below: The sprues have been cut off and the casting has been brushed off.
 After rough sanding and finishing.


 Below is a picture of the brown patina I want to use. I have tested it on here before I do more cleaning and polishing of the casting. I also removed a chunk of bronze from the neck of the dragon which will be concealed in the hull of the ship. Doing this, allows me to stretch my metal supply out and reduce weight.
 I cut out the mouth section, added teeth and then a last minute design change on the snout, to give it a more Scandinavian influenced look, Thanks to my studio partners for the critique.

 The head is now soldered to the bow of the ship.

Now, for some other stuff. I have been working on zipper bracelets and random other things. Here are some of them:

 I fixed a zipper that was missing the pull.
 Working on a hypo-allergenic type of adjustable zipper bracelet. There are still design issues to address with this one.

 Valentines day cuttle-bone bronze cast heart pendant. 
 A new piece I've been working on lately. It's based on a shape that I can't seem to get away from in drawing and sculpting. I think it may have to do with a fascination of black holes and dark matter.
 It's raised and fabricated copper out of a few silver plated copper platters. I did chasing on the top section last night 2-22-15




Thinking of design changes...
I've made 10 more zipper bracelets to go to the Nisse House of art in Westby WI.